6-Story Building with an exterior façade of precast
concrete panels and curtain wall construction.
The new pavilion connected to an existing 6-story structure
by two (2) 100’ bridges enclosed by curtain wall
construction. |
Calcedo’s contract included slab on grade concrete
slabs, interior core, elevators, (5 cars), exterior
shell and roof finishes. Total cost of the project,
with site work and other primes, was $40,000,000. |