Six-story building with an exterior façade of precast concrete panels and curtain wall
construction.
The new pavilion connected to an existing 6-story structure by two (2) 100’ bridges enclosed by curtain wall construction. |
Calcedo’s contract included slab on grade concrete slabs, interior core, elevators,
(5 cars), exterior shell and roof finishes. Total cost of the project, with site work and other primes, was $40,000,000. |